Thornton Bank

Thornton Bank is located at 30 km off the Belgium coast line. The total offshore wind park covers an area of 20 km² and contains 54 wind turbines, with a total capacity of 325,5 MW. This equals the annual power consumption of 600.000 inhabitants.

The wind farm will be built in 3 phases. Phase I: 6 turbines (gravity foundation. Phase II and III: 48 turbines.
The Thornton Bank Wind farm is expected to be fully operational by mid 2013.The Thornton Bank Wind farm is fully operational by mid 2013.
 

Kersten Europe Renewable Energy

Kersten Europe has been awarded with the production of the J-tubes, bellmouths and external platforms.

 

Full nameThornton Bank
Coordinates51.3839 /2.5538
CountryBelgium
WaterNorth Sea
TypeOffshore Wind Farm
Turbines54
FoundationGravity and Jackets
Total capacity325 MW
DescriptionJ-tubes, bellmouths and external platforms

 

Your web browser is outdated.

For correct viewing of this website is a recent version of your browser required. You can update your browser by downloading the latest version.