Dantysk

Kersten Europe delivered J-tubes with bellmouths to the Dantysk Substation. 

The 80 turbines of the Dantysk windfarm are spread out over an area of 66km2. The maximum capacity is 288MW, which equals the energy consumption of 200,000 German households. 

 

Kersten Europe

Kersten Europe manufactured the J-tube constructions for the Dan Tysk substation

The J-tubes have been rolled by the latest generation of bending machinery. The bellmouths have been cut to size by plasma cutting, rolled into cones and finished with welding edge preparations. After finishing the cones they have been welded on to the J-tubes. A guiding ring has been welded on the large diameter of the cone. 

Full name

Dan Tysk Substation

Coordinates

55.137º / 7.200º

Country

Germany

Water

North Sea

Type

Substation

Turbines

80

Fundation

Monopile

Total capacity

288MW

Description

Complete J-tube constructions

Your web browser is outdated.

For correct viewing of this website is a recent version of your browser required. You can update your browser by downloading the latest version.