Fly-over supports - 24Oktoberplein

A new four lane-fly over has been built at the " 24 Oktoberplein" in Utrecht to reduce the increasing traffic from the A2 Highway to the city center.

The fly over is approximately 6 meters high and 350 meters long.


Kersten Europe

The bent parts for the fly over's supports have been delivered by Kersten Europe.

Steel plates (th: 30 and 40mm) have been cut to size and rolled into columns. The columns have been welded together over the longitudinal seam and assembled to reach the requested height.

Your web browser is outdated.

For correct viewing of this website is a recent version of your browser required. You can update your browser by downloading the latest version.